Public input sought for new lane reduction project in Guntersville 

Reading time: 1 minute

SR 227 PIM Map edit scaled 1

The Alabama Department of Transportation is encouraging residents to give input on a lane reduction project on Alabama 227 in Guntersville.

The “road diet” is proposed by ALDOT to provide what they consider to be a more efficient lane configuration.

ALDOT proposes to reconfigure a four-lane and five-lane segment of SR-227 from Sims Street to Signal Point Road. After resurfacing, the road will be re-striped from two through lanes in each direction to one through lane in each direction and a two-way center left turn lane.

Residents can view maps of the proposed project and submit comments to ALDOT here. Participants are asked to submit comments by Monday, August 31.

Want more content like this? Follow Hville Blast on FacebookTikTokYouTube and Instagram, and be sure to subscribe to our newsletter.

Michael Seale
Michael Seale
Articles: 2775